01What the programmes publish for manufacturing and hardware companies
| What it wants | Size | Location | Range | |
|---|---|---|---|---|
| Mercor: Manufacturing & Industrial | "Production, maintenance and inspection records from the shop floor" | 20–2,000 | Anywhere | $100K–$1.5M |
| Mercor: Hardware Engineering | "CAD assemblies, circuit designs and test results from real products" | 20–2,000 | Anywhere | $45K–$1.35M |
| Mode | Email, documents, chat, CRM, billing and operations | 30+ | US strongest; others case by case | $100K–$5M |
| micro1 | SOPs, knowledge bases, CRM, project histories | 30+ full-time | US first; strong UK demand | Tiers $100K–500K to $2M+ |
Each programme's own pages, checked 30–31 October 2026. Ranges, not offers. Mercor's data page also names manufacturing, citing work orders, QA logs and spec sheets.
Where these records usually live
ERP and production
- SAP
NetSuite
Epicor- Odoo
Maintenance and quality
Fiix
UpKeep
ETQ
Design
SolidWorks- Autodesk
Altium
Examples of common tools, to help you find your records. Product names and logos belong to their owners; no affiliation or endorsement.
02Why buyers want it
A factory's records show physical work done well and badly: what was made, what failed inspection, what broke and how it was fixed. Years of work orders, QA logs and maintenance history linked to outcomes are hard to find anywhere else, which is why manufacturing tops Mercor's published ranges.
03What to check first
- Customer-owned designs. Contracts often give customers the drawings and specs you made for them.
- Export controls. Some technical data is controlled for export. Leave it out unless you are sure.
- Supplier NDAs. Data shared by suppliers usually came under confidentiality terms.
04What's usually licensable, and what isn't
05Before you apply
- List systems (ERP, MES, CMMS, QMS, CAD) and years of history.
- Separate your own product data from customer-commissioned work.
- Check export-control classifications for technical data.
- Remove staff names from work orders and logs.
This isn't legal advice.
06Get the free guide
The Data Licensing Guide for Manufacturers covers it in a PDF for manufacturers: what can be licensed, what customer contracts and export controls keep out, and each programme's published figures, with a worked example and the questions to ask before you sign.
07Check which programmes you're likely to match
Our free fit check asks about your size, location, records and tools, then shows which programmes you're likely to match. The programme decides.
08Questions people ask
What manufacturing data do AI companies want?
Mercor names production, maintenance and inspection records, plus work orders, QA logs and spec sheets. For hardware it wants CAD assemblies, circuit designs and test results.
Can we license designs we made for a customer?
Only if the contract leaves the rights with you or the customer agrees. Customer-commissioned designs often belong to the customer.
Sources
- micro1.ai/data-partnerships, checked 30 October 2026
- data.mode.inc, checked 31 October 2026
- data.mercor.com/refer (per-type listings), checked 31 October 2026
- mercor.com/data, checked 31 October 2026
